Projects
/Acer Sold
10
+ac
On Going Projects
0
Happy Clinents
0
+
Years of Experience
5
+
Available Plots 3.0

Farm House plots
Serene, spacious land for private countryside retreats.

Commercial Plots
Prime spaces for thriving businesses and enterprises.

Bungalow Plots
Exclusive plots for luxurious, custom-designed homes.

Highway Touch Plots
Prime spaces for thriving businesses and enterprises.

Investment plots
properties for lucrative returns on investment

Residential Plots
Ideal spaces for building dream homes in communities.
3.0 Available plots In Location
✈️ Navi Mumbai International Airport (NMIA)
🚆 Ranjanpada Railway Station
🚆 Nhava–Sheva Railway Station
🌉 Atal Setu (Mumbai Trans Harbour Link)
🛣️ National & State Highways
🚇 Pirkon / Punade Metro Station
🚄 Alibaug–Virar Corridor
⚓ JNPT Port (Nhava Sheva Port)
KSC New Town Ship Mahamumbai
- MMRDA has implemented the mega infrastructure project of the Mumbai Trans Harbor Link Project (MTHL). This project will trigger development in and around the region where the MTHL lands in Navi Mumbai Area because of opening of the land beyond island city of Mumbai for development. This area is well connected by Navi Mumbai International Airport, suburban railway network, metro rail network, Multi-modal corridor, Mumbai Goa highway, Mumbai-Pune expressway, JNPT based Dedicated Freight Corridor, the area is expected to attract large scale development of IT/ITeS, data hubs, Fintech, logistic parks, educational and health sector.
- As per the MMRDA Act, 1974, MMRDA has been entrusted with the responsibility to bring about a balanced development in accordance with the Regional Plan. Therefore, to achieve the same and with the intention of generating new revenue resources to finance the infrastructure and development in MMR.
- Given this advantageous location and the anticipated surge in private investments in the MTHL Influence Area, there exists tremendous scope for land value capture. With the entire land under its jurisdiction, MMRDA, as the Planning Authority, is uniquely positioned to leverage this opportunity through land incentivization instruments, strategic commercialization, and anchor investor engagement.
- The Authority has approved the development of Growth Centers in MMR using various planning tools such as TPS/ PPP model, etc. Appointment of MMRDA as NTDA for these developable areas will enable MMRDA to generate revenue which can be re-invested to execute the large scale infrastructure projects required to cater the rapid urbanization and achieve balanced development of the region





Virar-Alibaug Multi-Modal Corridor
- 126 km Virar-Alibaug Multi-Modal Corridor (VAMC or MMC) by MSRDC is an approved 8-14 lane access-controlled expressway with a route alignment connecting Navghar – Balavali within Mumbai Metropolitan Region (MMR) in Maharashtra.
- This greenfield expressway was originally planned in 2011 by the Mumbai Metropolitan Region Development Authority (MMRDA). In September 2020, a deal was signed to hand its construction to the Maharashtra State Road Development Corporation (MSRDC).
- The expressway will connect three districts Raigad. Thane. and Palghar. Its construction will be done in 2 phases Phase 1: a 96.41 km highway between Navghar and Balavali, and Phase 2: a 29,9 km highway between Balavali and Alibaug.
- The expressway is expected to be completed and opened in 2030. Its construction has been severely delaved due to land acquisition issues. The project’s Detailed Project Report (DPR) has not been made available online.




Mumbai Trans Harbor Metro
1.Length wise distribution (Total length : 49.60 Km)
Phase I – (Siddhivinayak – Dhutam)
- Underground portion: 3.985 Km
- Main Bridge length: 16.160 Km
- Elevated Portion: 5.675 Km
- At Grade: 2.080 Km
Phase II – (Dhutam – Dushmi)
- At Grade 27.90 Km
- Total Length: 49.600 Km
2.Stations Distribution (Total No. of stations: 20 nos.)
Phase I – (Siddhivinayak – Dhutam)
- Underground station: 04
- Relief Centre: 01
- Elevated portions: 02
- At grade: 01
Phase II – (Dhutam – Dushmi)
- At Grade 12
- Total Number Stations 20



Atal Setu Belondakhar
NEAR BY NAVI MUMBAI INTERNATIONAL AIRPORT & ATAL SETU SEA LINK
Plot Available in 1 Guntha to Acres EASY EMI – 0% INTEREST RATE Available Facilities:- Road
- Light
- Water
- Demarcation
- Name Plate
Essential Information
Connectivity

Local Railway

Metro

Airport

Atul-setu SeaLink

Express highway

jnpt port

Virar-alibaug corridor

Ferry Service
Popular Search
Email Support?
Copyright © 2026 clearlandrealty.com | Design by jaibhardwaz.com